Over this past weekend the hardwood floors in the living room, dining room, kitchen and mudroom were all refinished. They look fantastic. This made us be out of the house for the entire weekend since we couldn't be on the floors.
Tuesday our kitchen cabinets were delivered and started getting installed. The cabinets should be fully installed today and I can't wait to go see them after work. I have pictures posted below from how they looked yesterday.
In the next couple of days the dry wall in the mudroom, 3rd floor attic and the stairway openings should all be getting completed. The counter top for the kitchen are going to be templated tomorrow so we should have our counter top installed next week sometime. Our appliances are being delivered tomorrow. The kitchen is starting look like a real kitchen and by next week should hopefully look pretty close to done. I think the only thing that might not be done next week in the kitchen is the tile backsplash.
Yesterday PECO came out and did some work outside to run gas to the house. The meter is getting installed tomorrow and the line PECO ran outside is going to get connected to the house tomorrow. So then we will officially have gas to run our brand new heating system.
No comments:
Post a Comment